VMT News Ltd
No 1 News Site in Nigeria

FERMA completes 10 road projects appropriated to Kebbi in 2021- Official 

231

FERMA completes 10 road projects appropriated to Kebbi in 2021- Official 

The Federal Road Maintenance Agency (FERMA) in Kebbi, has completed 10 road projects appropriated to the state under the special maintenance repairs and special intervention of COVID-19 projects in 2021.

The agency’s Maintenance Engineer in the state, Mr. Rilwanu Usman, made this known while speaking with newsmen in Birnin Kebbi on Tuesday.

Usman said that the projects were completed in view of their economic and agricultural importance to people of the state.

“The works completed under special maintenance repairs are, construction of access road in Adamu Augie College of Education (COE), Argungu, which is 1.0 kilometer of access road constructed and about 750m line drain provided.

“Construction of culvert and drainage along Lailaba to Yeldu phase one, which was an additional 4.0 kilometers of earth road constructed with eight number culverts provided as well as culverts in a 2.5 kilometers of road of surface dressing as we are working within the limited fund.

“Special repairs of Malando- Ngaski – Warra Road, which is special repairs, involving patching of potholes, scraping of some section of about 2 kilometers in length, repaired with asphalt, among others.

Read Also: NGO trains,empowers 400 women in Taraba state

“Emergency repairs of scoured pile caps of bridge three in the flood- prone Fadama section of Argungu- Bui road.

“Special maintenance repairs of Tuga- Ka’oje road which is 0.72 of failed section fully repaired, involving potholes, among others,” he said.
Usman added that there were also five projects under the COVID19 special intervention programme which were competed in 2021.

“There was general maintenance of Birnin Kebbi-Jega- Sokoto road which is 1.7 kilometre of distress pavement strengthened with wearing course and over laid a new layer of asphalt.

“We also have Kalgo- Bunza-Kamba road, which had been giving motorists headache because of failed section and it was repaired with asphalt concrete.

“Argungu-Bui road, as some failed section of the road was repaired with asphalt wearing course, patching of potholes and construction of line drain.
“We have also completed 2.3 kilometers of Malando- Ngaski-Warra road, which was the certification of failed section and repairs with asphalt and well as patching of potholes.

“Lastly, Rijau- Ribah-Wasagu road, received attention under the COVID-19 programme as two number culverts were constructed, certified road length of 1.5 kilometers and patched more than 3,000 square meters of potholes under the COVID19 programme,” he said.

On direct labour, he said that wash- out bridge of Argungu – Bui Road, was also repaired sequel to approval by the Agency’s Managing Director, Nuradeen Rafin-Dadi, in 2021.

“We have done no fewer than 20 direct labour projects last year, and we also have series of approval to connect key roads with the main federal roads in the state.

“Through the efforts some of lawmakers in the state, we have installed numerous solar street lights in Koko, and are undergoing construction of drains and other road furniture, among other projects yet to come,” Usman said.

The maintenance engineer commanded FERMA’s M.D, lawmakers, Attorney -General of the Federation, Abubakar Malami and Gov. Atiku Bagudu for their efforts in making the state to be among the best in the maintenance of federal roads in the country.

Support Voice Media Trust journalism of integrity and credibility

Good journalism costs a lot of money. Yet only good journalism can ensure the possibility of a good society, an accountable democracy, and a transparent government.

For continued free access to the best investigative journalism in the country, we ask you to consider making a modest support to this noble endeavour.

By contributing to Voice Media Trust, you are helping to sustain a journalism of relevance and ensuring it remains free and available to all.

Donate into:

Dollar Account:

  • A/C NO: 3003093745
    A/C NAME: VOICE MEDIA TRUST LTD
    BANK: UNITED BANK FOR AFRICA

Naira Account:

  • A/C NO: 1023717841
    A/C NAME: VOICE  MEDIA TRUST LTD
    BANK: UNITED BANK FOR AFRICA

Leave a Reply